Welding job and repair of the 54% phosphoric acid concentration equipment of the Tunisian Chemical Group
Maintenance and repair of the 54% phosphoric acid concentration equ
Client
Tunisian Chemical Group
Location
Skhira Sfax
Start of work
2023
Delivery date
2023
Shot blasting of the bottom of the tank 11S28 at Bizerte refinery (STIR)
Shot blasting of the tank bottom Preparation of the tank bottom sur
Client
Bizerte refinery (STIR)
Location
Bizerte
Start of work
2022
Delivery date
2022
Prefabrication and replacement of wrapped PVC piping Mdhilla – GCT
Client
GCT
Location
Mdhilla
Start of work
.
Delivery date
.
Repair of the boilermaking and ebonite coating of the equipment of the concentration loops A ,B,C & D Skhira – GCT
Client
GCT
Location
Skhira
Start of work
.
Delivery date
.
Anti-clogging coating of the walls of the hopper and the phosphate storage silo at the Skhira plant TIFERT
Client
TIFERT
Location
Skhira
Start of work
.
Delivery date
.
Dielectric coating on the floors of the electrical room of unit 1000 of the phosphoric acid plant Gabés – GCT
Client
Groupe Chimique Tunisien
Location
Gabès
Start of work
.
Delivery date
.
Paving works and coating of the Skhira sulphuric cell with acid-resistant plate GCT
The retention basin is an area that serves to contain possible leak
Client
Groupe Chimique Tunisien
Location
Skhira
Start of work
.
Delivery date
.
GRP repair of the interior of the Chimney of the STP sfax workshop – GCT
Client
Groupe Chimique Tunisien
Location
TSP Sfax
Start of work
.
Delivery date
.
Micro concrete projection, butyle rubber coating and anti-acid carbon brick coating of the phosphoric acid reactor R3601A – GCT
Cuve d’attaque
Client
Groupe Chimique Tunisien
Location
Usines DAP Gabès
Start of work
2019
Delivery date
2019
Sandblasting and painting of the various equipment and framework of the Gabés factories – GCT
Marché Cadre
Client
Groupe Chimique Tunisien
Location
Usines Gabès
Start of work
2015
Delivery date
2017