Chemical Industry

Welding-job-and-repair-of-the-54%-phosphoric-acid-concentration-equipment

Welding job and repair of the 54% phosphoric acid concentration equipment of the Tunisian Chemical Group

Maintenance and repair of the 54% phosphoric acid concentration equ

Client

Tunisian Chemical Group

Location

Skhira Sfax

Start of work

2023

Delivery date

2023

Shot-blasting-of-the-bottom-of-the-tank

Shot blasting of the bottom of the tank 11S28 at Bizerte refinery (STIR)

Shot blasting of the tank bottom Preparation of the tank bottom sur

Client

Bizerte refinery (STIR)

Location

Bizerte

Start of work

2022

Delivery date

2022

8

Prefabrication and replacement of wrapped PVC piping Mdhilla – GCT

Client

GCT

Location

Mdhilla

Start of work

.

Delivery date

.

7

Repair of the boilermaking and ebonite coating of the equipment of the concentration loops A ,B,C & D Skhira – GCT

Client

GCT

Location

Skhira

Start of work

.

Delivery date

.

6

Anti-clogging coating of the walls of the hopper and the phosphate storage silo at the Skhira plant TIFERT

Client

TIFERT

Location

Skhira

Start of work

.

Delivery date

.

5

Dielectric coating on the floors of the electrical room of unit 1000 of the phosphoric acid plant Gabés – GCT

Client

Groupe Chimique Tunisien

Location

Gabès

Start of work

.

Delivery date

.

4

Paving works and coating of the Skhira sulphuric cell with acid-resistant plate GCT

The retention basin is an area that serves to contain possible leak

Client

Groupe Chimique Tunisien

Location

Skhira

Start of work

.

Delivery date

.

3

GRP repair of the interior of the Chimney of the STP sfax workshop – GCT

Client

Groupe Chimique Tunisien

Location

TSP Sfax

Start of work

.

Delivery date

.

06a

Micro concrete projection, butyle rubber coating and anti-acid carbon brick coating of the phosphoric acid reactor R3601A – GCT

Cuve d’attaque

Client

Groupe Chimique Tunisien

Location

Usines DAP Gabès

Start of work

2019

Delivery date

2019

02

Sandblasting and painting of the various equipment and framework of the Gabés factories – GCT

Marché Cadre

Client

Groupe Chimique Tunisien

Location

Usines Gabès

Start of work

2015

Delivery date

2017