Brushing and painting of gas storage sphere at the Gabés LPG plant – STEG
LPG gas storage spheres must have extreme protection against the or
Client
Société tunisienne de l'électricité et du gaz
Location
Ghannouch
Start of work
2011
Delivery date
2011

Brushing and painting of LPG line piping from the jetty to the LPG processing plant in Gabés – STEG
The piping of the LPG gas lines must have high corrosion protection
Client
Société tunisienne de l'électricité et du gaz
Location
Ghannouch
Start of work
2011
Delivery date
2011

Welding, sandblasting and anti corrosion coatings of the port portal of the silo of Cereals Office
The intervention of THI REVETEMENT consists in renewing the protect
Client
Office des Céréales Gabès
Lieu
Port de Gabès - Ghannouch
Début de travaux
2011
Date de livraison
2011
Valeur
.

Day and night marking of the towers of the various high voltage lines – STEG
The high voltage electric power transmission towers (220 KV; 150 KV
Client
Société tunisienne de l'électricité et du gaz
Location
Bouchemma / Ghannouch
Start of work
2011
Delivery date
2011

Sandblasting and exterior painting of the T7C fuel storage tank at the Skhira depot – TANKMED
The intervention of THI REVETEMENT consists in renewing the protect
Client
TANKAGE MEDITERRANEE S.A. (TANKMED)
Lieu
Terminal la Skhira
Début de travaux
2008
Date de livraison
2008
Valeur
.

Sandblasting and exterior painting of the crude oil storage tank S7 at the Bizerte refinery -STIR
Hydrocarbon storage tanks require periodic protection against corro
Client
Société Tunisienne des Industries de Raffinage
Location
Zarzouna - Bizerte
Start of work
2011
Delivery date
2011