The company T.H.I. REVETEMENT has carried out several painting and corrosion prevention jobs on various industrial facilities for oil, chemical and energy companies.
& learn more about the fields of application
Sandblasting and painting of the various equipment and framework of the Gabés factories – GCT
Marché Cadre
Client
Groupe Chimique Tunisien
Location
Usines Gabès
Start of work
2015
Delivery date
2017
Micro concrete projection, butyle rubber coating and anti-acid carbon brick coating of the phosphoric acid reactor R3601A – GCT
Cuve d’attaque
Client
Groupe Chimique Tunisien
Location
Usines DAP Gabès
Start of work
2019
Delivery date
2019
Sandblasting and exterior painting of the crude oil storage tank S7 at the Bizerte refinery -STIR
Hydrocarbon storage tanks require periodic protection against corro
Client
Société Tunisienne des Industries de Raffinage
Location
Zarzouna - Bizerte
Start of work
2011
Delivery date
2011
Sandblasting and exterior painting of the T7C fuel storage tank at the Skhira depot – TANKMED
The intervention of THI REVETEMENT consists in renewing the protect
Client
TANKAGE MEDITERRANEE S.A. (TANKMED)
Lieu
Terminal la Skhira
Début de travaux
2008
Date de livraison
2008
Valeur
.
Shot blasting and internal lining of the storage tank S6 at the Bizerte Refinery – STIR
Old hydrocarbon storage tanks are taken out of service periodically
Client
Société Tunisienne des Industries de Raffinage
Location
Zarzouna - Bizerte
Start of work
2014
Delivery date
2014
Day and night marking of the towers of the various high voltage lines – STEG
The high voltage electric power transmission towers (220 KV; 150 KV
Client
Société tunisienne de l'électricité et du gaz
Location
Bouchemma / Ghannouch
Start of work
2011
Delivery date
2011
Sandblasting and heat resistant painting of two combustion turbines located in Zarsis – Power Turbine
The intervention of T.H.I REVETEMENT consists in renewing the heat
Client
POWER TURBINE
Location
Station Zarzis
Start of work
2019
Delivery date
2019
Welding, sandblasting and anti corrosion coatings of the port portal of the silo of Cereals Office
The intervention of THI REVETEMENT consists in renewing the protect
Client
Office des Céréales Gabès
Lieu
Port de Gabès - Ghannouch
Début de travaux
2011
Date de livraison
2011
Valeur
.
Brushing and painting of LPG line piping from the jetty to the LPG processing plant in Gabés – STEG
The piping of the LPG gas lines must have high corrosion protection
Client
Société tunisienne de l'électricité et du gaz
Location
Ghannouch
Start of work
2011
Delivery date
2011
Brushing and painting of gas storage sphere at the Gabés LPG plant – STEG
LPG gas storage spheres must have extreme protection against the or
Client
Société tunisienne de l'électricité et du gaz
Location
Ghannouch
Start of work
2011
Delivery date
2011
GRP repair of the interior of the Chimney of the STP sfax workshop – GCT
Client
Groupe Chimique Tunisien
Location
TSP Sfax
Start of work
.
Delivery date
.
Paving works and coating of the Skhira sulphuric cell with acid-resistant plate GCT
The retention basin is an area that serves to contain possible leak
Client
Groupe Chimique Tunisien
Location
Skhira
Start of work
.
Delivery date
.
Dielectric coating on the floors of the electrical room of unit 1000 of the phosphoric acid plant Gabés – GCT
Client
Groupe Chimique Tunisien
Location
Gabès
Start of work
.
Delivery date
.
Anti-clogging coating of the walls of the hopper and the phosphate storage silo at the Skhira plant TIFERT
Client
TIFERT
Location
Skhira
Start of work
.
Delivery date
.
Repair of the boilermaking and ebonite coating of the equipment of the concentration loops A ,B,C & D Skhira – GCT
Client
GCT
Location
Skhira
Start of work
.
Delivery date
.
Prefabrication and replacement of wrapped PVC piping Mdhilla – GCT
Client
GCT
Location
Mdhilla
Start of work
.
Delivery date
.
Shot blasting of the bottom of the tank 11S28 at Bizerte refinery (STIR)
Shot blasting of the tank bottom Preparation of the tank bottom sur
Client
Bizerte refinery (STIR)
Location
Bizerte
Start of work
2022
Delivery date
2022
Welding job and repair of the 54% phosphoric acid concentration equipment of the Tunisian Chemical Group
Maintenance and repair of the 54% phosphoric acid concentration equ
Client
Tunisian Chemical Group
Location
Skhira Sfax
Start of work
2023
Delivery date
2023