The company T.H.I. REVETEMENT has carried out several painting and corrosion prevention jobs on various industrial facilities for oil, chemical and energy companies.

02

Sandblasting and painting of the various equipment and framework of the Gabés factories – GCT

Marché Cadre

Client

Groupe Chimique Tunisien

Location

Usines Gabès

Start of work

2015

Delivery date

2017

06a

Micro concrete projection, butyle rubber coating and anti-acid carbon brick coating of the phosphoric acid reactor R3601A – GCT

Cuve d’attaque

Client

Groupe Chimique Tunisien

Location

Usines DAP Gabès

Start of work

2019

Delivery date

2019

Sablage-et-peinture-extérieur-du-réservoir-de-stockage-du-pétrole-brut-S7-à-la-raffinerie-de-Bizerte-STIR S7

Sandblasting and exterior painting of the crude oil storage tank S7 at the Bizerte refinery -STIR

Hydrocarbon storage tanks require periodic protection against corro

Client

Société Tunisienne des Industries de Raffinage

Location

Zarzouna - Bizerte

Start of work

2011

Delivery date

2011

Sablage-et-peinture-extérieur-du-bac-de-stockage-dessence-T7C-au-dépôt-Skhira-TANKMED

Sandblasting and exterior painting of the T7C fuel storage tank at the Skhira depot – TANKMED

The intervention of THI REVETEMENT consists in renewing the protect

Client

TANKAGE MEDITERRANEE S.A. (TANKMED)

Lieu

Terminal la Skhira

Début de travaux

2008

Date de livraison

2008

Valeur

.

04d

Shot blasting and internal lining of the storage tank S6 at the Bizerte Refinery – STIR

Old hydrocarbon storage tanks are taken out of service periodically

Client

Société Tunisienne des Industries de Raffinage

Location

Zarzouna - Bizerte

Start of work

2014

Delivery date

2014

02e

Industrial Painting of Metal Frame and Electrical Current Transformers for HV/MV Substations – STEG

The intervention of T.H.I REVETEMENT consists in renewing the anti-

Client

STEG

Lieu

Poste Mnihla

Début de travaux

2003

Date de livraison

2003

Valeur

.

Balisage-diurne-et-nocturne-des-pylônes-des-différentes-lignes-haute-tension-STEG

Day and night marking of the towers of the various high voltage lines – STEG

The high voltage electric power transmission towers (220 KV; 150 KV

Client

Société tunisienne de l'électricité et du gaz

Location

Bouchemma / Ghannouch

Start of work

2011

Delivery date

2011

POWER-TUIRBINE-ZARZIS-2

Sandblasting and heat resistant painting of two combustion turbines located in Zarsis – Power Turbine

The intervention of T.H.I REVETEMENT consists in renewing the heat

Client

POWER TURBINE

Location

Station Zarzis

Start of work

2019

Delivery date

2019

pont-mobile-de-Bizerte-

Sandblasting and painting of the metal span and accessories of the mobile bridge of Bizerte

The intervention of THI REVETEMENT consists in renewing the coating

Client

Ministry of Equipment Tunisia

Location

Regional Directorate Bizerte

Start of work

2004

Delivery date

2004

00101

Welding, sandblasting and anti corrosion coatings of the port portal of the silo of Cereals Office

The intervention of THI REVETEMENT consists in renewing the protect

Client

Office des Céréales Gabès

Lieu

Port de Gabès - Ghannouch

Début de travaux

2011

Date de livraison

2011

Valeur

.

LGP

Brushing and painting of LPG line piping from the jetty to the LPG processing plant in Gabés – STEG

The piping of the LPG gas lines must have high corrosion protection

Client

Société tunisienne de l'électricité et du gaz

Location

Ghannouch

Start of work

2011

Delivery date

2011

Sablage-et-peinture-des-sphères-de-stockage-gaz-à-lusine-GPL-LPG-Gabés-STEG

Brushing and painting of gas storage sphere at the Gabés LPG plant – STEG

LPG gas storage spheres must have extreme protection against the or

Client

Société tunisienne de l'électricité et du gaz

Location

Ghannouch

Start of work

2011

Delivery date

2011

3

GRP repair of the interior of the Chimney of the STP sfax workshop – GCT

Client

Groupe Chimique Tunisien

Location

TSP Sfax

Start of work

.

Delivery date

.

4

Paving works and coating of the Skhira sulphuric cell with acid-resistant plate GCT

The retention basin is an area that serves to contain possible leak

Client

Groupe Chimique Tunisien

Location

Skhira

Start of work

.

Delivery date

.

5

Dielectric coating on the floors of the electrical room of unit 1000 of the phosphoric acid plant Gabés – GCT

Client

Groupe Chimique Tunisien

Location

Gabès

Start of work

.

Delivery date

.

6

Anti-clogging coating of the walls of the hopper and the phosphate storage silo at the Skhira plant TIFERT

Client

TIFERT

Location

Skhira

Start of work

.

Delivery date

.

7

Repair of the boilermaking and ebonite coating of the equipment of the concentration loops A ,B,C & D Skhira – GCT

Client

GCT

Location

Skhira

Start of work

.

Delivery date

.

8

Prefabrication and replacement of wrapped PVC piping Mdhilla – GCT

Client

GCT

Location

Mdhilla

Start of work

.

Delivery date

.

Shot-blasting-of-the-bottom-of-the-tank

Shot blasting of the bottom of the tank 11S28 at Bizerte refinery (STIR)

Shot blasting of the tank bottom Preparation of the tank bottom sur

Client

Bizerte refinery (STIR)

Location

Bizerte

Start of work

2022

Delivery date

2022

Welding-job-and-repair-of-the-54%-phosphoric-acid-concentration-equipment

Welding job and repair of the 54% phosphoric acid concentration equipment of the Tunisian Chemical Group

Maintenance and repair of the 54% phosphoric acid concentration equ

Client

Tunisian Chemical Group

Location

Skhira Sfax

Start of work

2023

Delivery date

2023

Those who trusted us!

  • logo_old
  • logo_alkimia
  • stir-logo-1
  • Logo_Societe_tunisienne_electricite_gaz.svg
  • tankmed-1
  • Untitled-1